![]() |
Al Dubiak |
|
We have a great treat in store for all of you. Here is the first good photographic record of a Falco being built in the sequence outlined in the Falco Construction Manual. The photographs and what they show of the construction process are exceptional, and we will be using many of the photographs in future editions of the Falco Construction Manual. Alfred Scott |
Installing the elevator leading edge ribs
The trailing edge ribs go on.
Bending the elevator leading edge skin.
Gluing the leading edge skin in place.
The elevator is now partially skinned. Steve (Al's father and
co-builder) is with the stabilizer in the jig.
|
Go back to Al Dubiak