Doug Henson

 

The aileron/flap construction was supervised by Max the Cat.
I was able to relocate the gardening equipment for this project, but not Max's bed.

 

 

The left aileron/flap ready for closure.

 

 

Skinning complete, awaiting dryout. I used the Craig Bransfield method of wetting the
plywood surface with damp cloths. When dry, things shrink up and make a nice taut surface.

 

 

Completed parts are stored on the ceiling. Note the wing spar and elevator.
The ailerons/flaps are also up there, but out of the field of view.

 

 

Locating W.L.0 and B.L.0 on each fuselage frame.

 

     

 

Go back to Doug Henson